Basic Design Finalized

by / Wednesday, 23 November 2016 / Published in News
Slider Design

After 6 months of hard work with engineering support from Royal HaskoningDHV, KCI The Engineers and MARIN, we have finalized the MonobaseWind design for the Borselle Kavel 5 Demonstrator location. The project received a considerable finacial support from the Netherlands Government as part of the Renewable Energy support program.
The result is a hybrid steel and concrete structure with simple details and designed to carry a large wind turbine.

The scope of work included the geotechnical, structural and naval arcitectural design.
The deliverables include:

  • Study Report
  • Basis of Design
  • Structural analysis report
  • Construction drawings Concrete Foot and Base
  • Construction drawings Steel Leg and appurtenances
  • Transport and Installation Drawings
  • Risk Register

Please contact Jan Groot for more information jgr@monobasewind.com

TOP